Environmental measures
Nagoya-city authorization Ecological business establishment
 |
Nagoya-cityユs authorization for an Ecological business establishment.
We authorized a business establishment carry out the action, that
Nagoya-city considered the environment in their operation. We
believe that a company can continue to grow and live in harmony with
the environment simultaneously. |
Water processing system
 |
With a UF device, we collect paint included in a water closet after the
painting in the electrodeposition painting process. This process gets
rid of waste and stabilizes quality.
It is the superior devices which environmental safeguards can play. |
Pure production system
 |
Using an RO film, it produces pure water used by an electrodeposition
painting process.
Because it does not need hydrochloric acid for resin, reproduction
unlike the ion exchange type, the drainage that is necessary does not
appear in the improvement and the reproduction of the work
environment. Also it uses 100% or water supply by using the
concentration of water for preprocessing. |
Drainage processing system
 |
All of the water which drained away by an electrodeposition painting
process goes along the strictly maneged drainage processing.
Therefore only the safe water is exhausted to the sewer.
Even if a trouble happens in a machine and drainage system, there is
an urgent pit of 10 tons. We do not have to worry it will passed to the
sewer with water before the processing. |